The following MicroMVD vocabulary can be used for construction sequencing data.
Feature: Construction sequencing In order to analyse construction sequencing schedules For construction sequencers and site managers Specific model metadata and structure is required Scenario: All piles are identifiable and contain data * All piles must be assigned to a concrete or steel material * All piles must have their type assigned with one of the following values: | Value | | BORED | | DRIVEN | Scenario: All multistorey elements are divided per storey * All walls are limited to the height of their current storey. * All columns are limited to the height of their current storey.
You can fill out the variables using the guide below.
Variable | Example | Description |
---|---|---|
{guid}
|
28q3AgmxP5cepIweO5Of$o | This is a 22 character GlobalId for a particular IFC element. |