MicroMVDs for exchange requirements/Excavation MicroMVD
From Wiki.OSArch
< MicroMVDs for exchange requirements
Revision as of 11:18, 28 July 2022 by Duncan (talk | contribs) (Duncan moved page Excavation MicroMVD to MicroMVDs for exchange requirements/Excavation MicroMVD)
The following MicroMVD vocabulary can be used to ensure that the model captures data relevant to bulk excavation works during construction.
Feature: Excavation In order to evaluate costs and construction sequencing of excavation work For cost planners and construction planners Excavation volumes must be present in 3D with relevant metadata Scenario: Bore hole log data must be digital * Bore hole log data must be in "{format}" format Scenario: Bulk excavation volumes must be present * At least one excavation volume is present. * Excavation volumes must be uniquely named from the following list: | Name | | {name} | * All excavation volumes must be assigned to a material, named from the following list of possible materials: | Name | | {material_name} | * All excavation volume materials must be broken down into its constituents * All excavation volume materials must store the material density * All excavation volume materials must store the bulking factor as a property called BulkingFactor in a custom property set called uMVD_MaterialExcavation
You can fill out the variables using the guide below.
Variable | Example | Description |
---|---|---|
{format}
|
csv | A digital format to extract bore hole data from |